Our Packages
INCLUDES:
-
Detailed project report (DPR)
-
Soil test & topographic survey
-
Cost estimation & BOQ
-
Engineering & municipal approvals
-
Multi-vendor coordination
INCLUDES:
-
Site analysis & basic architecture
-
Civil construction & finishing
-
Standard plumbing & electrical
-
Quality checks at key stages
-
Estimated Timeline: 3–6 Months
INCLUDES:
-
Structural + MEP design integration
-
RCC framework, glass façade
-
HVAC, fire safety & access systems
-
Project reporting & site supervision
-
Estimated Timeline: 6–9 Months
INCLUDES:
-
Site preparation & excavation
-
Steel or RCC structural framework
-
Foundation for heavy loads
-
Power, water & drainage setup
-
Floor finishing & utility zones
INCLUDES:
-
Energy-efficient design & planning
-
Solar panel & rainwater harvesting setup
-
Thermal insulation & eco-materials
-
Green certifications & compliance
-
Estimated Timeline: 6–9 Months
INCLUDES:
-
High-end architectural design
-
Imported materials & finishes
-
Smart home automation setup
-
Custom landscaping & exterior works
-
Estimated Timeline: 8–12 Months